by Admin | Apr 15, 2020 | News
A high-pressure laminate (HPL) cladding system believed to be in use on thousands of buildings has dramatically failed a safety test, with flames ripping through a nine metre test rig in under eight minutes. It saw a cladding system made of ‘standard grade’ HPL and...